Market · 29 Apr 2026 · 7 min read
The 173-km Pune Outer Ring Road re-rates affordability belts. Wagholi, Pirangut, and the south Pune rim — what changes and when.
Quick answer
The ring road connects Pune's outer corridors at highway speed, compressing commutes to the IT belts. Wagholi → Hinjewadi drops from 70 min to ~30 min once the eastern leg opens. Wagholi, Pirangut, Sus, Lohegaon are the long-horizon plays.